In September Maschinen- und Stahlbau Dresden will be presenting its products and services at the International Trade Fair for Transport Technology, Innovative Components, Vehicles and Systems in Berlin.
The muck moving system consists of horizontally movable frames for moving two buckets at a time and lifting beams for lifting out the buckets.
Modernisation of the more than 100 years old suspended railway on the slopes of the Elbhänge area, Dresden-Loschwitz.
Production of the drive engineering, electrics and controls of a sliding roof for the adventure pool in Baunatal.
Production and delivery of Starter structure Lot 1 (5450mm tunnel diameter): 4x connecting ring, diameter 1x star-shaped bracing, diameter 3x starter gaskets, diameter (structural steelwork) 3 sets (2 per set) Phoenix...
The route of Line C of Rome's underground railway provides for mechanical drilling of two parallel tunnels with a diameter of 6.71 m and a length of approx. 17.6 km each to be built using a TBM system (tunnel boring machine).